Karl Heinz Dietrich Logistics Center

Construction of Single-Storey Hall, Site Development, Land Fencing, Utilities & Site Setup – BV W6
RAP Instal: Execution of Heating, Electrical and Plumbing Installations

All systems were designed and executed in compliance with Romanian technical regulations and meet the seven essential performance requirements
  • Structural resistance and stability
  • Operational safety
  • Fire safety
  • Hygiene, human health & environmental protection
  • Thermal insulation, waterproofing & energy efficiency
  • Acoustic comfort
  • Sustainable use of natural resources
#RAPINSTAL #BuildingInstallation #IndustrialProjects #ElectricalSystems #HVAC #Plumbing #LogisticsIndustry #Brasov #RAPGROUP #ElectricalInstallations #HVACInstallations # PlumbingInstallations

About

Client
SC KARL HEINZ DIETRICH INTERNATIONAL EXPED SRL

Industry
Logistics

Built Area
~11.000 mp

Location
Brașov

Execution period
Octombrie 2023 – Septembrie 2024

Details

Electrical installations
• Power supply
• Indoor and emergency lighting
• Socket networks
• Indirect contact protection
• Grounding and lightning protection

Low voltage systems
• CCTV surveillance
• Fire detection and alarm system
• Intrusion detection

Thermal installations
• Hall heating with air heaters
• Mechanical ventilation
• Air conditioning
• Smoke extraction system

Plumbing installations
• Cold and hot domestic water supply
• Wastewater drainage (indoor and outdoor)
• Rainwater drainage

Gallery

+40 727 362 153
instal.office@rap-group.ro